Papers in Proceedings

Papers in Proceedings

  • Reihenfolgeproblem bei der Acrylglasherstellung, Operations Research Proceedings 1989, Springer, Berlin u. a. (1990), 214-221, (with W. Domschke, H. Friedrich and B. Schildt).
  • Genetic algorithms as metaheuristics for solving combinatorial optimization problems, Proceedings ASCIS - Workshop on Global Optimization (1991), 46-55.
  • Combining genetic and local search for solving the job shop scheduling problem. Symposium on Applied Mathematical Programming and Modeling APMOD93, Akaprint, Budapest (1993), 142-149, (with U. Dorndorf).
  • Genetic algorithms for job shop scheduling. Operations Research Proceedings 1992, Springer, Berlin (1993), 243-250, (with U. Dorndorf).
  • Variable depth search and embedded schedule neighbourhoods for job shop scheduling. Proceedings of the 4th International Workshop on Project Management and Scheduling (1994), 232-235, (with U. Dorndorf).
  • Knowledge acquisition through schedule decomposition. Operations Research Proceedings 1993, Physica, Heidelberg (1994), 389-392.
  • Application of a modified disjunctive graph for the job shop scheduling problem. Proceedings of the 4th International Symposium on Methods and Models in Automation and Robotics (1997), 935-940, (with J. Blazewicz and M. Sterna).
  • Job shop scheduling by disjunctive graph analysis. Proceedings of the 5th International Symposium on Methods and Models in Automation and Robotics (1998), 1029-1034, (with J. Blazewicz and M. Sterna).
  • The machine representation of the disjunctive graph. Proceedings of the 6th International Workshop on Project Management and Scheduling (1998), 177-180, (with J. Blazewicz and M. Sterna).
  • Nowa reprezentacja maszynowa grafu dysjunkcyjnego dla problemu szeregowania w ogolnym systemie obslugi. Proceedings of the XI National Conference on Automation of Discrete Industrial Processes (1998), 45-54, (with J. Blazewicz and M. Sterna).
  • Recent developments in scheduling. Operations Research Proceedings 1998, Springer, Berlin (1999), 353-365, (with U. Dorndorf and T. Phan Huy).
  • Branch and propagate in open shop scheduling. Proceedings of the 2nd International Workshop CP-AI-OR’00 (2000), 29-32, (with U. Dorndorf and T. Phan Huy).
  • Total late work criteria for shop scheduling problems (1999). Operations Research Proceedings 1999, Springer, Berlin (2000), 354-359, (with J. Blazewicz, M. Sterna and F. Werner).
  • Complexity of scheduling problems with late work criteria. Proceedings of the 7th International Workshop on Project Management and Scheduling (2000), 70-72, (with J. Blazewicz, M. Sterna and F. Werner).
  • Constraint propagation in open shop scheduling. Proceedings of the 7th International Workshop on Project Management and Scheduling (2000), 111-113, (with U. Dorndorf and T. Phan Huy).
  • Branch and propagate in open shop scheduling. Proceedings of the World Multiconference on Systemics, Cybernetics and Informatics Vol XI (2000), 219-221, (with U. Dorndorf and T. Phan Huy).
  • Extension of the disjunctive graph model for the job shop scheduling problem. Operations Research Proceedings 2000, Springer, Berlin (2001), 359-365, (with J. Blazewicz and M. Sterna).
  • The weighted flow shop problem with a common due date and late work criterion. Proceedings of the 8th International Workshop on Project Management and Scheduling (2002), 69-72, (with . Blazewicz, M. Sterna, and F. Werner).
  • Abschließender Kommentar zu “Bedarfsgerechte Fahrzeugvorhaltung in der Diskussion”, Notfall & Rettungsmedizin 5 (2002), 629, (with H. Behrendt and R. Schmiedel).
  • Dynamic programming for 2-machine shop problems with weighted late work criterion. Proceedings of the 6th Workshop on Models and Algorithms for Planning and Scheduling Problems (2003), 36-37, (with J. Blazewicz, M. Sterna and F. Werner).
  • The binary NP-hardness of the two-machine job shop problem with the weighted late work criterion. Proceedings of the INOC2003 - International Network Optimization Conference (2003), 101-106, (with J. Blazewicz, M. Sterna and F. Werner).
  • Complexity and approximability of a single-item economic lot-sizing problem with a non-uniform resource. Proceedings of the 9th International Workshop on Project Management and Scheduling (2004), 375-379, (with S. Chubanov and M. Kovalyov).
  • A branch and bound method for one-shift production optimization in a flexible manufacturing system. Proceedings of the 9th International Workshop on Project Management and Scheduling (2004), 159-262, (with J. Blazewicz and M. Sterna).
  • A fully polynomial time approximation scheme for the capacitated economic lot-sizing problem with a monotone cost structure. Proceedings of the 7th Workshop on Models and Algorithms for Planning and Scheduling Problems (2005), 80-83, (with S. Chubanov and M. Kovalyov).
  • Metaheuristic approaches for the two-machine flow shop with weighted late work criterion. Proceedings of the 7th Workshop on Models and Algorithms for Planning and Scheduling Problems (2005), 262-265, (with J. Blazewicz, M. Sterna and F. Werner).
  • Modeling robust flight gate scheduling as a clique partitioning problem. Proceedings of the 10th International Workshop on Project Management and Scheduling (2006), 175-179, (with U. Dorndorf and F. Jaehn).
  • Gate scheduling at airports, Proceedings of the International Symposium on Scheduling 2006 (eds. H. Fujimoto and T. Ibaraki) (2006), 1-5, (with U. Dorndorf).
  • Genetic algorithms for late work minimization in a flow shop system, Proceedings of the 3rd Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2007), 455-462 (with J. Blazewicz and M. Sterna).
  • Revenue maximization on parallel machines, Operations Research Proceedings 2008, Springer, Berlin (2009), 153-158 (with M. Sterna and J. Juraszek).
  • A new branch and bound algorithm for the clique partitioning problem, Operations Research Proceedings 2008, Springer, Berlin (2009), 457-462 (with F. Jaehn).
  • A generic approach to proving NP-hardness of partition type scheduling and other combinatorial problems, Proceedings of the 9th Workshop on Models and Algorithms for Planning and Scheduling Problems (2009), 204-205, (with M. Kovalyov).
  • An approximation scheme for concave network flow problems, Proceedings of the 9th Workshop on Models and Algorithms for Planning and Scheduling Problems (2009), 247-249, (with S. Chubanov).
  • Simulated Annealing method for maximizing revenue on on parallel machines, Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 699-702, Dublin, Ireland, (with M. Sterna and J. Juraszek).