Univ.-Prof. Dr.-Ing. Peter Burggräf
Kontakt
Weblinks
Büroadresse
Weblinks
Weblinks
Weblinks
Data on the current state of problem solving and improvement during physical product development within complex (manufacturing) systems
Data on the current state of problem solving and improvement during physical product development within complex (manufacturing) systems
Integrated factory modelling: Using bim to disrupt the interface between manufacturing and construction in factory planning
Integrated factory modelling: Using bim to disrupt the interface between manufacturing and construction in factory planning
The Minimal Viable Production System (MVPS) - An Approach for Agile (Automotive) Factory Planning in a Disruptive Environment
The Minimal Viable Production System (MVPS) - An Approach for Agile (Automotive) Factory Planning in a Disruptive Environment
Automation decisions in flow-line assembly systems based on a cost-benefit analysis
Automation decisions in flow-line assembly systems based on a cost-benefit analysis
Data on the current state of modular systems in a highly dynamic environment
Data on the current state of modular systems in a highly dynamic environment
Quadrotors in factory applications: design and implementation of the quadrotor's P-PID cascade control system
Quadrotors in factory applications: design and implementation of the quadrotor's P-PID cascade control system
Object attribution for factory information models,Paradigmenwechsel im Fabrikplanungsdatenmanagement
Object attribution for factory information models,Paradigmenwechsel im Fabrikplanungsdatenmanagement
Data Quality-Based Process Enabling
Data Quality-Based Process Enabling
Systematic planning approach for heavy-duty human-robot cooperation in automotive flow assembly
Systematic planning approach for heavy-duty human-robot cooperation in automotive flow assembly
Arbeitswelten in der Fabrik der Zukunft
Arbeitswelten in der Fabrik der Zukunft
Flow Chart Based Information Modeling for Factory Planning
Flow Chart Based Information Modeling for Factory Planning
How to design and realise the best automotive factory within 15 months
How to design and realise the best automotive factory within 15 months