NOTE -- Installation of "Bridge Railing" [AR_P]

=> Temporäre Sperrung der Mensa Einfahrt "AR_M" sowie dem Brücken "Ein- u. Ausgang" Bauteil: AR_P

Severity:
Medium

Dear Users,

On September 18, 2026, two railings will be delivered and installed on the entrance bridge of the AR_P section (see aerial view, yellow markings).

AR_P_GELÄNDERMONTAGE

To do this, both railings must be lifted by a crane across the roadway onto the entrance bridge of Building: AR_P.

The crane will be positioned near the current location of the bike rack, which will be temporarily removed for this purpose and therefore cannot be used. 

During the time window from approximately 7:00 a.m. to 1:00 p.m., no pedestrian, car, or truck traffic will be permitted in the area of the bridge due to suspended loads!

During the time window mentioned above, access to the AR_P section willonly be possible via the lower main entrance; entry or exit via the bridge will not be possible at that time.

 

For safety reasons, an additional 2 car parking spaces in the immediate vicinity will be cordoned off!

 

Duration of the work:

Start: Friday , September 18, 2026 | - all day -

End: Friday, September 18, 2026 | - all day -

Thank you for your understanding and cooperation.

Sincerely
Your TGM Operations Office Team